PROJECT: Supervision Of The Construction Of Adiyan Waterworks Phase II
CLIENT: Lagos State Government State Consultancy Board
FINANCING: Lagos State Government
SCOPE: Daily throughput 320,000 cu.d
PROJECT DESCRIPTION:
Preliminary Services for revalidation of Contractor’s Design Review and Confirmation of Design Parameters; Hydrology; Soil Mechanics; Topography and Design Integration;
– Physical Design Concept and Adaptation
– Design Calculation on General Design Layout and defined throughout; verify Hydraulics;
– Checking of Structural Components.
– Supervision of the Construction of the Adiyan Waterworks Phase II
– Post Construction Supervision during Defect Liability Period
– Environmental Impact Assessment; and Environmental Mitigation Proposal
The Raw Water Intake is located in the Akute area, on the right bank of River Ogun and its WTP Plant is located at the Oke-Aro site about 8.0 km away.