• Environmental impact assessment studies.
• Preliminary design.
• Detailed engineering and final design.
• Tender documents and confidential cost estimate.
• Determination of quantities and cost.
• Pre-qualification procedures and evaluation.
• Elaboration of training requirements.
• Development of professional staff training